Cost management & reporting ​

Once data is uploaded, CargoShip tracks what it actually cost and helps you understand where the money goes. Everything is organized around projects — each upload is tagged with a project ID (the manifest upload ID, or whatever you pass to --project), and costs roll up per project.

The cargoship cost command tree covers reporting, forecasting, and burn-rate analysis. For the exhaustive flag list, see the cost command reference.

Tag your uploads

Cost tracking is only as useful as your tagging. Pass --project on every upload so spend attributes to something meaningful:

bash
cargoship upload ./data s3://my-bucket/archives/ --project genomics-2026

List projects and their spend ​

bash
cargoship cost projects

Lists every project that has cost records, with total cost per project. Add --json for scripting. To drill into a single project:

bash
cargoship cost project 20251206-abc123

This shows the cost breakdown by region and storage class, files processed, data volume, compression savings, and a daily timeline.

Generate a cost report ​

bash
cargoship cost report --period month

Produces a detailed report for a time window (today, week, month, last_month) with totals, breakdowns by service/region/storage class, trends, and optimization recommendations. Save it to a file or emit JSON:

bash
cargoship cost report --period month --output report.json --json
Grant compliance reports (NSF / NIH)

cost report can also generate a data-management compliance report for a specific project, suitable for federal grant reporting:

bash
# NSF compliance report (JSON)
cargoship cost report --budget my-project-id --grant NSF-2024-12345 --format compliance

# NIH compliance report as human-readable text
cargoship cost report --budget my-project-id --grant R01-GM123456 \
  --format compliance --agency NIH --text

The report includes data provenance, reproducibility info, and the data management plan. Use --agency NSF (default) or --agency NIH.

Forecast future spend ​

CargoShip fits your spending history to a model and projects forward at 7, 14, 30, 60, and 90 days, with confidence intervals and model-accuracy metrics (R², MAE, RMSE).

bash
# Forecast across all projects
cargoship cost forecast

# Forecast one project with a specific model
cargoship cost forecast 20251206-abc123 --model ensemble --days 60

Four models are available via --model:

ModelBest for
linear (default)Stable or steadily-trending spend
exponentialAccelerating / seasonal growth
moving_averageSmoothing out volatile day-to-day spend
ensembleCombines all three; most robust for production

Trust the fit, not just the number

Check the reported R² before acting on a forecast. Above 0.8 is a good fit, above 0.9 is excellent. A low R² usually means you don't have enough history yet (aim for at least 7 days) or a large one-off upload skewed the trend.

Analyze burn rate ​

Burn rate is how fast you're spending. cost burnrate reports current daily, weekly, and monthly rates alongside historical stats (average, min, max, volatility) and a trend direction with predicted future rates.

bash
cargoship cost burnrate --days 90
cargoship cost burnrate 20251206-abc123 --days 60

Predict budget exhaustion ​

Given a budget and current spend, predict the date it runs out:

bash
cargoship cost exhaustion --budget 1000 --spent 450
cargoship cost exhaustion 20251206-abc123 --budget 500

Returns the exhaustion date, days remaining, and probability bounds. This is the analytic behind budget projection alerts — to enforce a limit rather than just predict it, set a budget (see below).

From reporting to enforcement ​

Reporting tells you what happened; budgets stop overspending before it does. The two share a data model — cargoship cost budget … and cargoship budget … are the same subcommand tree. Once you understand your spend here, cap it in Budgets & volume quotas and get notified via Alerts & notifications.

Best practices ​

TIP

  • Tag --project from day one — retroactive attribution isn't possible.
  • Review cost projects weekly to catch a runaway project early.
  • Forecast with --model ensemble for production; check R² before trusting it.
  • Watch the burn-rate trend, not just today's number — acceleration is the early warning.
  • Pipe --json into your monitoring to chart spend over time.
  • Turn insight into limits: once a project's steady-state cost is clear, set a budget so surprises get blocked, not just reported.